Our second bathroom is up and running again. We had the bathroom put in at the end of July. In fact we bought low-VOC paint the day before we found out about the second m/c. Due to some shower design flaws we had a leak issue and had been unable to use if for several months. J is especially happy to have it back. Without further ado, I present the "new" bathroom.
Before: It was an "attic" storage space on the same level as the upstairs (our house is a Cape). In case you can't tell that is a classy cardboard wall.
After:
We lost some space due to building regulations as it was considered new construction rather than renovating an existing space. Basically the ceiling had to be at least a certain height at all points so there is practically nothing behind this well, but we did get a nice built-in storage space.
This one is the best I could get of the light, which is also a ceiling fan.
No comments:
Post a Comment